Rock Wall and Picturesque View


CAMP HOWARD February 16, 2018

Our regular Tuesday afternoon meeting at Camp Howard to visit with architects and builders did not disappoint!  I am so excited to see the framing and walls go up on “Mary’s Lodge”.  The building continues to take shape.

Below: A new road, required by the Fire Dept. is located below the building and is the point from which the photo is taken.  The concrete is outdoor patio/eating space and there will be an outdoor fireplace which can be seen in the photos below.

IMG_7878

Below: Three quarter view of the end and side of the building.

IMG_7883

Below: A large opening for doors and windows show the spectacular view.

IMG_7895

An outdoor decorative rock wall juxtaposed to the outdoor fireplace will provide a wonderful outdoor environment for special events.

IMG_7905

Below: Working outdoors under a plastic tent, the fireplace takes shape!

IMG_7910

Below: Putting up the glue laminated beams!

IMG_7917

Hans Etlin, from Soderstrom Architects, inspects the specially fabricated hardware which will hold the massive timbers at the entrance to the building.

IMG_7926

Did you see us on TV?


KPTV FOX 12 is our channel…Camp Howard is our Advertisement…check it out here!

https://vimeo.com/fox12/review/254006066/56ae530a88

Walls and Fireplaces


The crew at Todd Construction is very enjoyable to work with.  They are constructing the new “Mary’s Lodge at Camp Howard.”  We meet every Tuesday rain or shine and go over the schedule and anything relevant to the smooth working of the construction projects. We try to get photos every week and here are the current happenings:

Below:  Walls are going up on the new Dining Hall at Camp Howard!IMG_7828
Below:  The firewall is being installed inside one of the fireplaces to grace the new dining hall at Camp Howard.
IMG_7833
Below:  Stone being applied to an outer wall facing the outside eating area
IMG_7827
Stone worker enthusiastic about his work doing beautiful work on the outside wall.  The Lord loves a cheerful worker!
IMG_7824

Building Rain or Shine


Not a surprise, seems like more rain than shine these days at Camp Howard as contractors work through the drizzle to finish up the foundation of the new “Mary’s Lodge at Camp Howard!”

When the project is finished, I plan to perch myself in front of the windows overlooking the Bull Run and Mt. Hood and drink coffee all afternoon with friends!  Call me to get your name on the list of friends who would like to join me! 503-231-9484

Below: The plastic “tent” is actually scaffolding surrounded by plastic to keep rain off of the fireplace that is being installed.  Pretty exciting to see the work being done!

IMG_7804

Inside the “tent” small glimpse of the inside of the fireplace and firewall being installed.

IMG_7810

Framers lay out the area where walls will spring up.  In no time they will have the walls up and a cover over the building so they can work inside.  That is my prediction!  We will see how long it takes!IMG_7811

IMG_7808